01

01

Overview

Overview

Transforming Wiring for Low Voltage CC

Making industrial wiring faster, clearer and less error-prone to save $6.5M+ annually

Zola replaces paper diagrams and tribal knowledge with a guided digital workflow for technicians building and validating industrial wiring panels.

Role

User Experience Lead

Timeline

4 years

Platform

Desktop App

Key Outcome

$6.5M+ saved

02

02

The Challenge

The Challenge

A workflow built on paper, memory and guesswork & a bad way to track progress

Technicians relied on printed diagrams and years of tribal knowledge to wire panels correctly. Small mistakes were invisible until a unit was already built.

Paper diagrams • Tribal Knowledge • No error checks • Inconsistent tracking

03

03

Research & Insights

Talking to the people who are building the assembly panels

Contextual inquiry • Shop-floor interviews • Workflow mapping • Understanding assembly process

01

01

Errors surface weeks after wiring, not at the point of mistake.

02

02

New technicians lean entirely on senior staff to catch issues.

03

03

Every plant had quietly invented its own shorthand for the same diagrams.

60%

Motor Control Centre labor is wiring

48%

Production issues are wiring related

4+ weeks

Of training required to read a schematic

Complexity

Is the main reason sited to quit

04

04

Defining the Experience

From tribal knowledge to a shared system.

Before

After

05

05

The Solution

A simpler way for technicians to understand, build and validate wiring.